As per Letter No. SFC-B 2/45/2026-FIN, dated 28/09/2026, the annual mustering for social security pension beneficiaries must be completed on or before 31/10/2026.
VBG RAM G

VB-G RAM G
 
മിഥുൻ ടി.എം.
MIDHUN T.M.
Accredited Engineer

☎ 9656284848 

മേഘ എം.വി.
MEGHA M.V.
Overseer

☎ 9946581883 

സ്മേര
SMERA T.K.
Accountant cum IT Assistant

☎ 9567260010 

നന്ദന
NANDHANA A.N.
Accountant cum IT Assistant

☎ 7994615763 

VB-G RAM G

Viksit Bharat – Guarantee for Rozgar and Ajeevika Mission (Gramin)

A new rural employment programme aimed at creating employment opportunities and strengthening rural infrastructure.

📌 About the Scheme

VB-G RAM G stands for Viksit Bharat – Guarantee for Rozgar and Ajeevika Mission (Gramin). It is a new rural employment programme introduced by the Central Government as a replacement for the Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGA).

The scheme is being implemented as part of the ‘Viksit Bharat’ vision of transforming India into a developed nation by 2047. Works under the scheme are broadly organised around four major areas: water security, rural infrastructure, livelihood infrastructure and disaster resilience.

⭐ Key Features

👷

Employment Guarantee

The existing 100-day employment guarantee has been increased to 125 days.

💰

Financial Sharing

60% of the scheme expenditure will be borne by the Central Government and 40% by the State Governments.

📱

Digital Governance

Biometric attendance, mobile-based monitoring and AI analytics are incorporated to ensure transparency.

🌱

Development Priorities

Priority is given to water security, rural infrastructure and works aimed at addressing climate change and strengthening resilience.

60% Central Government
40% State Government
90:10 North-Eastern / Himalayan States

🎯 Major Areas of Work

💧

1. Water Security Works

Water conservation, irrigation, groundwater recharge, rejuvenation of water bodies, watershed development and afforestation.

🏗️

2. Rural Infrastructure

Infrastructure related to education, healthcare, drinking water, sanitation, road connectivity, renewable energy and community services.

🌾

3. Livelihood Infrastructure

Infrastructure development activities aimed at strengthening rural livelihoods and improving the productivity and sustainability of local economic activities.

🛡️

4. Extreme Weather & Disaster Mitigation

Flood protection, cyclone shelters, embankments, wildfire control, restoration of community assets and windbreak and protective plantations.

💧 Water-Related Works

  • Construction of canals, flood channels or diversion channels, check dams, gully plugs and underground dykes.
  • Construction or rejuvenation of ponds, percolation tanks, recharge pits, recharge shafts, injection wells and other associated water-harvesting structures.
  • Irrigation through open wells, micro-irrigation channels and field-level water distribution systems.
  • Reclamation and restoration of community waterlogged lands.
  • Afforestation and plantation activities related to soil and moisture conservation.
  • Rooftop rainwater harvesting and other decentralised groundwater recharge systems.

🔐 Transparency & Digital Monitoring

👆

Biometric System

Digital systems for recording attendance and monitoring programme activities to improve transparency.

📍

Geo-tagging

Geo-tagging mechanisms for recording the location of works and strengthening monitoring and transparency.

📊

AI Analytics

AI-based tools for monitoring programme implementation and analysing relevant data.

📝

Grievance Redressal

Provision for submitting and addressing grievances at different levels of implementation.

GOALS

Along with creating rural employment opportunities, the scheme aims to contribute to the overall development of rural areas by strengthening water security, improving basic infrastructure, supporting livelihoods and enhancing resilience to climate-related and disaster risks.